Daily Activities
Home Up Product Info Support Client Relations About Us

Suggested daily traffic activities

In this section, we will provide an overview of the traffic programs most often used. Though we will go into more detail below in Suggested daily traffic activities, typical traffic activities include the following:

Reconciling and posting yesterday’s logs

Entering new programs, contracts, and copy

Printing future logs

Using bulk contracts and automation linking (depending on your system)

As you enter new programming and contracts, this information automatically fills into the appropriate portions of the log. You can then print the log or upload it to your automation equipment. This section will detail the typical daily work load for traffic management.

Suggested daily traffic activities

Though daily traffic activities will vary depending on the station and traffic management needs, the most common traffic activities include the following:

Reconciling the log(s) for the previous day or weekend

Stations using an automation system will upload the previous day’s log.

Posting reconciled logs (optional)

Entering new programs, bulk contracts, contracts, and copy orders

Printing confirmations (in traffic management - misc reports)

Rescheduling makegoods

Printing the Schedule Discrepancy Summary

Editing a log, making any final changes

Assigning filler spots to a log

Printing missing copy summary and correct copy errors

Assigning copy to a log

Printing a log

Stations using automation systems will download the log to the system.

Backup your data!!!

 

Reconciling logs

Use the edit a log program in traffic management-daily activity to reconcile the previous day’s log. When reconciling your logs, you check to see what actually ran and then change the times on the system’s log to ensure they are the same as the station’s logs. To do this, follow these procedures:

If a break ran at a different time than specified in Summit, use F8 to change the start time of that break. All spots within that break will move with it.

If a spot did not run at all, use the F7 key to remove it and place it into makegoods.

If a spot is not going to be made good, you can cancel that spot from the schedule page in contract data entry.

Continue following the above procedures until the edit a log matches your printed logs.

If you are using an automation system and have the automation upload program in use, when you upload, the system will automatically reconcile your log.

Before invoicing, make sure that you have made all necessary changes to the log. The logs must reflect what really happened.

Posting reconciled logs

Posting logs is an optional feature. Using this feature helps you recognize logs that have already been reconciled. To use this feature, answer Yes in customization of traffic management -daily activity (Log posting in use? Page 2). If you are using this feature, Summit requires you to post all logs for a billing period before running invoices.

Use post a log for the following situations:

If you are using paid programming.

If you are using bulk contracts and you want to daily track how much of your bulk contracts have been used

If you are using program inventory and want to track the actual run times of programs

If you are using an automation system

To use this feature, select post a log from the traffic management - daily activity menu. Enter the date of the log(s) that you want to post, making sure that you are posting in chronological order. In other words, do not post the 20th of the month until all days before the 20th have been posted.

 

Entering new programs

Enter daily programming in enter programming. Each program consists of the following:

Header page: Contains general information for an entire program.

Element pages: Contain detailed scheduling information (e.g., program elements and avails) with the following criteria:

Element pages must be in chronological order

Run times must fall within the start and end times of the header page

You must have an element page for every break that needs to print on the log and be filled.

If you forget an element page or need to add another, use F8 to insert a page where you need it.

Duplicating programs

If you need to enter a new program that is very similar to an existing program, press F8 to duplicate a program. With this duplicating feature, you only need to make minor changes. To duplicate a program, follow these steps:

In enter programming, choose the program you wish to duplicate, press F8 - Duplicate

A pop-up window will appear, choose the program or range of programs that you wish to duplicate.

Change stations/zone/group? Answer Yes to change the station/zone/or group on the new program. To? If you answered Yes in the previous field enter the station /zone/ or group this new program is valid. Applicable to multi-station operations only.

Change valid from? Answer Yes if you wish to change the valid from date on this new program. In the subsequent field enter the new date.

If you choose to duplicate from a program that you have just canceled, remember to change the valid from date to a date in the future.

Change valid thru ? Answer Yes if you wish to change the valid thru date on this new program. In the subsequent field enter the new date.

Change valid days? If the program(s) you are duplicating are valid the same days(s) of the new program answer No in this field. If the valid days are different answer Yes in field number 9 and answer Yes in the subsequent fields for the days the new program is valid.

Change run time? Answer Yes if you wish to change the run time on the new program Or Move ahead by? Enter the hours and/or minutes you wish to move the new program ahead. Or Move back by? Enter the hours and/or minutes you wish to move the new program back.

Change Pre-empt program or Regular? Answer Yes if the new program is opposite status of the program(s) you are copying. For example 1) if you are copying a Regular program to a Pre-empt you would answer Yes and in field number 18 you would answer P for Pre-empt, 2) if you are copying a Pre-empt to a Regular you would answer Yes and in field number 18 you would answer R for Regular, 3) if the program you are copying is the same status (Regular) to a (Regular) or (Pre-empt to a Pre-empt) then you would answer No and disregard field number 18.

If you wish to add breaks to a duplicated program, you will do this after duplicating the new program.

Changing programs

If you need to overwrite a regular program with a program just for a specific date, pre-empt the program in enter programming. After you enter schedule information, the system will ask you if the spot is a regular or pre-empt. Spots bumped by pre-empt programming are either rescheduled or placed in the makegoods pending file.

You cannot make changes to programs that are currently running. However, if you need to make changes to a program that is already running (e.g., adding a new break), follow these steps:

Cancel that program.

Once the program is canceled, use the F8 key to duplicate that program or use the stop/restart command.

Change the from date on the new program to a date after the thru date on the original program. By changing these dates, you prevent two program from simultaneously running.

Now that you have a new program starting in the future, you are free to make any changes to that new program.

Summit provides quick ways to make changes to programs previously entered. For example, say you had entered special programming for a basketball game and the game is rescheduled. To change this information, you would press F8 from the program header page. Use the Change option to enter a new date on a program page. If there is a game delay, Summit can Move the program and automatically adjust its detail pages to the new start time.

Make sure you move programs to an available space, not a time that already has a program scheduled. Avoid scheduling two regular programs for the same time. You can make small day-to-day programming changes by using the "Clone" option. The "Clone" option copies a program into a new program and is also used for scheduling contracts by program. You make changes, but the system keeps track of where the program was copied from. To use this option, follow these steps:

Enter your "model" programs in enter programming.

Make any necessary adjustments.

Re-time for accurate in/out timing on your schedule.

The system will now enter a pre-empt program for the date that you specified, leaving the original program intact.

Running specific spots

If you want to have spots run during particular avail breaks, enter an avail type code. Enter this code on the element page for that avail break. The default avail type indicates what type of spot can run in that break. When entering avail types, you can add your own codes that are specific to your programming needs.

Do not use an avail type of 0 because it will override all other parameters for scheduling spots. Please contact a Summit Software Technician for more details.

After you have entered all of your programs, run a programs to run summary or skeleton schedule for each day of the week. These reports do the following:

Check the accuracy of your entry

Verify that you have all the programming that you need.

If you need to check avail breaks, print the element pages.

Entering new contracts

Use contracts to place spots on a log and to bill the account. Spots schedule interactively at the time of order entry – each time you enter a new order, the spot schedules on active logs. When necessary, Summit reorganizes spots based on placement priorities, etc. This reorganization process takes a few seconds to a few minutes, depending on the number of spots on your contract and the number of active logs extended.

You have the following options when entering contracts:

Specifying the billing group and cycle

Allowing for agency, rep firm, and account exec commissions

Sending the bill to the agency, rep firm, or directly to the advertiser

Billing gross or net

Including a notarized script

Printing more than one copy of the invoice

In contracts, you can schedule the following:

Commercial spots

Co-op contracts

Package billing

Pre-paid contracts

Promos

Public service announcements (PSAs).

Commercial spots

All regularly billed commercial spots need a contract entered. Each contract contains one or more schedule pages, and/or miscellaneous billing pages. If the order has more than one spot running in a given scheduling parameter, enter copy pages for each spot on a copy order in enter copy and rotations, then add that copy order to the contract.

See Co-op contracts below for more information.

If you need to schedule your spots during specific avail breaks, you must "type match" the break and the spot. Under avail type, enter a type code (press F3 while in that field to add a new code). Remember that the same avail type must be entered on that break in program data entry.

Only spots with corresponding avail types will run during that break.

Use spot priority on the schedule page to ensure that some spots schedule before others. Priorities are 1-9 and a-z, with 1 = highest priority and z = lowest priority. Though 5 is the default priority, you can change this default in the customization program of traffic management-daily activity. In this same customization program, you can also set up implicit priorities based on rate and/or schedule span. Implicit priorities will cause the system to take either or both of these factors into account (rate/schedule span) when trying to schedule two spots with the same priority.

Spots with a priority of f-z will not show up in the makegood file if bumped. These priorities are generally used for promos and PSAs.

Co-op contracts

Enter co-op contracts with corresponding copy orders for each product. To use co-op contracts, set the rotation or percentage assignments in the copy orders. Co-op invoices include a summary page for the advertiser and a separate detail page for each product. To use this feature, type Yes in the Co-op invoice field of the contract header page. When billing, you can choose to bill your co-op contracts together with regular contracts or separately.

Package billing

To bill out a contract with a package amount, enter a miscellaneous billing page on that contract for the dollar amount of the package. Enter the package name (or an abbreviation) under pckg on the schedule page. If you would like to show an average rate per spot on your revenue analysis and revenue projection, calculate an average rate per spot for that schedule page and enter it under rate.

The system will not use this field for billing purposes but for internal reporting purposes if there is something in the pckg field.

If you are entering an average rate per spot on the schedule page, specify No to include the miscellaneous billing page itself on revenue reports.

The invoice will print the package name under the rate and show the miscellaneous billing page as a separate charge with the package description and total package amount for the billing period.

Pre-paid contracts

Specify a contract as pre-paid on the header page of the order. Enter the order when you receive payment. If you do not have the schedule at this time, enter it onto the contract later. Enter the payment through enter other a/r transactions in accounts receivable. Invoices show the pre-payment amount; charges will be added to the invoice during billing.

Refer to the Accounts Receivable section for more information on pre-payments.

Paid programming

Paid programming is handled very differently in Summit 2.7. Instead of entering contracts as paid programs, you enter these programs through enter programming (Program Data Entry). To enter paid programs, follow these step:

Go into traffic management - daily activity / enter programming (menu 1).

Press F3 to add a new program.

Specify if this is a regular or pre-empt spot, then add all necessary data.

Make sure you specify the station if you have multiple stations.

Add the run time.

In the Paid Programming field, type Y.

After you have added all data, arrow down (â ) to pull up the paid programming window.

In the paid programming window, choose the advertiser, which will autofill advertiser data after selected. Enter any additional applicable information.

The Rate field is for each time the show airs.

In the Customization program of traffic management - daily activity, go to page two. Make sure is set to the following, though field #6 is optional:

 

 

 

 

PSA and Promo contracts

PSAs and Promos are entered just like commercial spots. However, you need to know the following information about entering PSA and Promo contracts.

If these contracts do not need an invoice, enter 0 for Number of invoice copies on the contract header page.

If you are using these spots as fillers, enter a priority of f-z.

Remember that missed spots will not go into the makegoods file.

Since these spots will not automatically be assigned to the log, you need to assign them to logs in a separate step.

Refer to the Assigning Filler Spots to a Log section for more information.

Remember to enter different pages for 10, 15, 20 and 30 second spots.

PSAs and Promos can be type matched to run in specific avail breaks (e.g., children’s PSAs running during children’s programming).

Bulk contracts

Use bulk contracts when an advertiser agrees to buy X amount of dollars of air time, which will be used at later times. One bulk contract can accommodate different individual contracts with different spot lengths, rates, and dollar amounts. Summit tracks the use of bulk contracts automatically for you. After you post a log, the percentage of contracts used vs. remaining dollar amount left will change accordingly.

Posting logs is mandatory if you have bulk contracts.

Entering copy

Use the enter copy & rotations program of traffic management - daily activity when an advertiser provides more than one piece of copy for an order. To enter copy, follow these procedures:

Using detail pages, schedule each piece of copy based on the date(s), program, daypart, run time, or days of the week.

If the copy is running throughout the run times on the contract schedule page, you can leave the run dates and times blank.

If copy if rotating evenly, specify even rotation on the header page and the system will automatically schedule one after the other.

If the rotation is not even, you can specify a rotation pattern or rotate spots by a percentage (enter each spot’s percentage on the detail page).

You can choose to attach the actual script to each piece of copy. If you select this option, press F8 on each page to enter the script. On the contract header page in contract data entry, answer Yes to Notarize script?. The script will then print with the invoices.

Printing confirmations

You can print confirmations for one or more contracts, including some or all of the advertisers, agencies, or account executives. For all confirmations (contract, bulk, or copy), you can design your own layout. The Summit system comes with several basic confirmation layouts. In traffic utilities/customization, you can choose to automatically print confirmations for all new records entered, as well as specify which layout to use for those confirmations.

Rescheduling makegoods

If Summit is unable to place a spot on a log, it appears on the makegoods list. From this list, you can either add it to the scheduling process, or cancel it. When you add a makegood, no additional revenue adds to the order. Conversely, the dollar amount of an order decreases if you cancel a makegood.

To reschedule makegoods, following these guidelines:

Use F3 to reschedule a single spot from reschedule makegoods of traffic management-daily activity. This feature will write the spot onto a log if possible, or leave the spot in makegoods.

If you want to schedule a spot outside its original run time and for this change to show on the invoice, press F4. Using F4 in reschedule makegoods will leave the original spot in the makegood file and add a spot onto a later schedule. The system will mark the original spot as rescheduled in the makegood file and print "makegood for MM/DD/YY" next to the rescheduled spot on the invoice.

You can also choose to reschedule all spots in makegoods at one time. To reschedule all makegoods, press F8 and choose Reschedule all. Specify the from and thru dates of makegoods that you want to reschedule. Any spots that the system is unable to schedule will remain in makegoods.

Printing the Schedule Discrepancy Summary

The Schedule Discrepancy Summary compares a list of spots ordered with a list of spots that actually ran. You can use this summary to determine if anything needs to be scheduled out of makegoods and to spot any errors you may have made when entering contracts. This summary will do the following:

Reflects when incorrect copy has been assigned

Shows when copy is missing

Indicates if any spots are running outside of their ordered run times and/or run dates

Editing logs

Use edit a log to make changes to a log before and after it airs. In edit a log, you can do the following:

Move spots to different run times

Remove spots from the log to the makegoods file

Add spots from the makegoods pending file (Press F3)

Change copy orders or their detail pages

Add a spot directly from a contract (Press F4)

When you use the F4 option, the system will ask you for an unused spot number from the contract and page numbers that you specify. Each spot has its own discreet spot number. Choose an unused spot number to avoid scheduling the same spot twice.

If not otherwise indicated, press F8 to select most of the above options.

Assigning filler spots to a log

You can have Summit automatically assign filler spots to all empty avails on your logs. To save time, Summit does not schedule filler spots with a priority f-z unless specified.

Just before printing a final log, run this program to fill unused avails. If you have a lot of filler spots on your log, you may want to schedule the longer spots before the shorter spots to ensure the best avail fill. To schedule the longer spots first, go to traffic customization/scheduling standard selection (Page 1), and answer Longest to the field Start each cluster with longest, shortest, or random lengths (l, s, r)?

Missing copy summary

Use the Missing Copy Summary report to see a list of incomplete orders (for any date) associated with scheduled contract orders or contract orders without an attached copy order. Summit considers a copy order incomplete for the following reasons:

If none of the run dates or times allow scheduling with valid run dates and times on the contract order

If the copy order or contract has no cart number on it.

Print the Missing Copy Summary before printing the final log. After correcting the copy or contract order, run assign copy to a log in traffic management-daily activity.

If you run this report for date(s) that have been extended, the system will print missing copy information for any scheduled spot.

However, this report will not print information for spots in the makegood file, so ensure you have made final edits to your log before printing this report. If you run the report for date(s) that have not been extended, the system will print missing copy information for any spots projected to run in edit projected schedule.

Assigning copy to a log

Unlike programs and contracts, copy does not schedule at the time of order entry. Run this program to add copy pages to logs before printing them. The system will assign a copy page to all contracts with a copy order number attached to them. You can assign copy (or re-assign) to any date(s) in the future. If you choose to re-assign copy, the system will assign copy pages to any copy orders with unassigned copy; it will not change assigned copy pages. If you need to change a copy order that has already been assigned, use the F8 feature in Edit a Log.

 

Printing logs

Summit continually reschedules logs as you enter contracts and programs. When printing logs, consider the following:

You can print logs for any day(s) without waiting for processing.

You can print a log as many times as you want without changing or preventing future edits to that log.

You can print specific time periods or a range of pages. Do not try to specify both a range of page numbers and a time period.

Though your system comes with basic log layouts, you can also custom design your own logs in any layout design. If you are going to customize a log layout from print a log, press F3 to add a new layout. Choose to duplicate from the layout that is closest to what you want (there are seven different standard layouts), and then make any necessary changes.

Automation download/upload (Send Schedule to Automation/Auto-reconcile Schedules)

If you are using an automation system, your final step is to download your log into your automation system. Because automation equipment and your use of it varies, Summit has custom programs for each client. You will receive instructions/documentation with your custom program.

Extending active schedules

Use the extend active schedules programs to extend your current number of active schedules. Active schedules automatically fill with current program and contract information. Sales and avails reports are accurate only if the report dates include active schedule dates. Activate only enough schedules to provide the reports and schedules that you want because maintaining many active schedules at one time will delay data entry.

When you select extend active schedules, the system will automatically fill in the start date. Accept this date as your starting date for extending new schedules. Extend schedules once and in chronological order.

If you try to extend a date that has already been extended, this may cause damage to your logs.

The extend active schedules program is sensitive to changes in the hard drive. Once you have begun extending schedules, do not re-boot your computer or use the ctrl-break key to end schedule processing.

 

 

 

Contents Search News Feedback
Send mail to webmaster@summitsoftware.com with questions or comments about this web site.
Copyright © 2006 Summit Software Systems, Inc.
Last modified: October 25, 2006