|
|
|
Through Edit Schedules you can add spots from the Makegoods Pending file, remove spots to the makegoods file, change copy order numbers/page, move spots by changing the run time, change criteria for an avail/break, make certain changes to programming (e.g. a game ran long), etc. Use in conjunction with View Makegoods. You can use this module to edit schedules before printing the final log, to edit after the log has aired (reconcile the log), and to make adjustments to the log before billing. Many functions are available from the form menus and also by right-clicking in the grid. You can open multiple schedule windows if you wish to view or edit multiple dates and/or channels simultaneously. You can drag & drop to edit spot and makegood placement, or use the menu options along the top, or by right-clicking in the schedule or makegood window. You can drag & drop between schedule windows, and between schedule windows and the makegood window. If you need to navigate the grid while dragging, position the mouse pointer over the navigation buttons. Use control+click to highlight spots to exchange. Double-click a contract number, copy number, or page number in any window to open the data entry form for that item. When reconciling your logs, you check to see what actually ran and then change the times on the system’s log to ensure they are the same as the station’s logs. To do this, follow these procedures:
Note: spots will not necessarily appear in breaks in the order they will appear on logs and in schedule files. The system will adjust breaks before printing logs and creating schedule files if you are using longest or shortest break length fill, break position filling, or dual spots.
Edit MenuAdd Makegood To Schedule - add the highlighted M/G to the schedule at the highlighted position. Insert Spot From Contract - add a spot directly from a contract to the schedule at the highlighted position. Remove Spot To Makegoods - remove the highlighted spot to makegoods. Change Runtime - change the run time of the highlighted spot. This should be done only when manually reconciling spots because it allows moving a spot outside of a break, normally an illegal operation, which can cause errors on some reports.
Change Copy - change the copy page number of the highlighted spot.
Change Break - change the highlighted break time, size, etc.
Change Program - change the highlighted program length etc. keeping spots or moving them to makegoods. Cancel Selected Spot - cancel the highlighted spot. Open New Edit Window - open a new schedule edit window (only available from the main edit window).
Search MenuJump To Time - jump to a specified run time.
Find Contract by Number - find the next occurrence of a specified contract.
Find Contract by Description - find the next occurrence of a specified contract.
Find Advertiser by Number - find the next occurrence of a specified advertiser.
Find Advertiser by Description - find the next occurrence of a specified advertiser.
Find Program by Number - find the next occurrence of a specified program.
Find Program by Description - find the next occurrence of a specified program.
Find Break by Number - find the next occurrence of a specified break.
Find Break by Description - find the next occurrence of a specified break.
Tools MenuClear Breaks - clear specified breaks, moving spots to makegoods and setting size to zero.
Options MenuSelect the way you want descriptions to display.
|
|
Questions or problems regarding this web site should be directed to webmaster@summitsoftware.com
.
|